AIRSIDE IMPROVEMENTS PROGRAM,
GEORGE BUSH INTERCONTINENTAL
AIRPORT, HOUSTON, TEXAS, USA
Conceptual Design of
Appurtenances for 8L-26R Runway
Alternatives. Appurtenances
include A.O.A. perimeter fence,
perimeter roads, service roads,
determination of developable
infield area using tower sidelines
and Part 77 contours, access roads,
taxiway bridges, utility corridor,
location of ARFF and Airfield
Ground Maintenance facilities,
demolition of existing structures,
utilities and infrastructure and area
requiring clearing and grubbing.
Design for the construction of
new pavement for the Terminal E
Ramp and upgrading the former
Terminal C Southeast Ramp. The
project involves installation of the
fueling system (fuel lines, fuel pits,
EFSO System) to serve the new
Terminal “E” gates, 15,000 linear
feet of 18” and 24” RCP storm
sewer system and 11,000 linear feet
of ¾” and 2” waterlines. The
project also involves construction
of new environmental station and
approximately 166,000 SY of 17”
concrete pavement for relocation
of Southeast “C” Taxi lane and
Terminal “E” apron.