INTERSTATE 10 KATY FREEWAY RECONSTRUCTION
PROGRAM, TEXAS, USA
The USD 1.7 Billion, IH 10 Katy Freeway
reconstruction project is a landmark project for the
Houston district of TxDOT and involves the
widening of Interstate 10 from its existing
condition to a 22-lane facility with an 8 to 12 lane
divided highway, 4 managed lanes to be used as
HOT lanes (High Occupancy and/or Toll) and 3 to
4 lane frontage roads in each direction. The
project includes 22 miles of urban freeway with 2
fully directional interchanges and 52 grade
separations. The existing reversible HOV lane has
been replaced with a 4- lane managed facility.
SH 130 TOLL ROAD, TEXAS, USA
The USD 1.1 Billion, SH 130 Program consists
of a 91 mile long fully access controlled, grade
separated tollway facility. As Central Texas has
grown, so has its traffic congestion. SH 130, a
project of the Texas Department of Transportation,
is intended to relieve traffic in the area by creating
a commuter and NAFTA corridor
alternative to Interstate 35 (I-35). When
completed, SH 130 will extend from
north of Georgetown east of
metropolitan Austin to I-10 near Seguin.
AIRSIDE IMPROVEMENTS PROGRAM,
GEORGE BUSH INTERCONTINENTAL
AIRPORT, HOUSTON, TEXAS, USA
Conceptual Design of
Appurtenances for 8L-26R Runway
Alternatives. Appurtenances
include A.O.A. perimeter fence,
perimeter roads, service roads,
determination of developable
infield area using tower sidelines
and Part 77 contours, access roads,
taxiway bridges, utility corridor,
location of ARFF and Airfield
Ground Maintenance facilities,
demolition of existing structures,
utilities and infrastructure and area
requiring clearing and grubbing.
GREATER HOUSTON WASTEWATER PROGRAM,
HOUSTON, TEXAS, USA
The Greater Houston Wastewater Program (GHWP)
was a five-year $1.2 billion project to control wet weather
overflows in the City’s sanitary sewer system. Houston's
wastewater system is one of the largest in the nation, with
43 wastewater treatment plants, 5,600 miles of sewers and
320 lift stations.